Bedrooms: 2, Floor: 4, Floors: 4, reinforced concrete structure, Completion date: 06.2024, Stage of construction: construction completed including all installation
Bedrooms: 2, Floor: 1, Floors: 4, reinforced concrete structure, Completion date: 03.2024, Stage of construction: construction completed including all installation
Yard area: 538 m2, Bedrooms: 4, Floors: 2, reinforced concrete structure with brickwork / 2013, Stage of construction: permission to use
6/3/19, 4:01 PM
10903
Offer No. 347975
We may have offers that match your search but are not officially announced for privacy reasons. If you would like to receive information about our confidential offers, please fill out the request form.
Completion date: 12.2025, First line with sea view, Stage of construction: elevation +0.00 Confidential offering! For more information about this offer, please contact the agent listed above.
Completion date: декември,2017г, Stage of construction: construction completed including all installation The complex is situated in the exotic beach resort Shkorpilovtzi. Located in a beautiful area and at the same time close to all amenities.The complex has a swimming pool for adults and children. The yard ...
Bedrooms: no separate bedroom, Floor: 3, Floors: 5, reinforced concrete structure with brickwork, Completion date: 06.2024, Stage of construction: Rough construction
Bedrooms: no separate bedroom, Floor: 3, Floors: 5, reinforced concrete structure with brickwork, Completion date: 06.2024, Stage of construction: Rough construction
Bedrooms: no separate bedroom, Floor: 2, Floors: 4, reinforced concrete structure with hanging facade and brickwork / after 2010, Distant sea view, Stage of construction: permission to use
Bedrooms: no separate bedroom, Floor: 5, Floors: 7, reinforced concrete structure with brickwork / after 2000, First line without sea view, Stage of construction: permission to use
Bedrooms: 1, Floor: ground floor, Floors: 6, reinforced concrete structure with brickwork / after 2000, First line without sea view, Stage of construction: permission to use
Bedrooms: no separate bedroom, Floor: 5, Floors: 5, reinforced concrete structure with brickwork / after 2010, Stage of construction: permission to use