Bedrooms: no separate bedroom, Floor: 2, Floors: 4, reinforced concrete structure with hanging facade and brickwork / after 2010, Distant sea view, Stage of construction: permission to use
Bedrooms: no separate bedroom, Floor: 3, Floors: 5, reinforced concrete structure with brickwork, Completion date: 06.2024, Stage of construction: Rough construction
Bedrooms: 1, Floor: ground floor, Floors: 6, reinforced concrete structure with brickwork / after 2000, First line without sea view, Stage of construction: permission to use
Bedrooms: no separate bedroom, Floor: 3, Floors: 5, reinforced concrete structure with brickwork, Completion date: 06.2024, Stage of construction: Rough construction